PS Ensdorf
120 MWel, 376 t/h

Legend
Selected References of Steinmüller Engineering
Achievements
Flexible use of the boiler with a shorter start-up time.
- Reduction in warm start-up time by 50 % (<1 hour)
- Reduction in start-up oil consumption by 25 %
Boiler design
- Once-through steam generator built 1964
- Two pass slag-tap furnace
- 120MWel
- Main steam: 376 t/h at 535 °C and 174 bar
Scope of Supply
- Process engineering for the installation of a recirculation on a once-through steam generator
- Retrofitting of separation vessel and circulation system by modifying suction and discharge of pipes, fittings, pump, expander, vents and drains, heat-up and evaporation economizer line
- Supplement of steel structure such as platforms, stairs, brackets
- Modification in I & C and boiler protection