PS Ensdorf

120 MWel, 376 t/h

Legend Selected References of Steinmüller Engineering

Achievements

Flexible use of the boiler with a shorter start-up time.

  • Reduction in warm start-up time by 50 % (<1 hour)
  • Reduction in start-up oil consumption by 25 %

Boiler design

  • Once-through steam generator built 1964
  • Two pass slag-tap furnace
  • 120MWel
  • Main steam: 376 t/h at 535 °C and 174 bar

Scope of Supply

  • Process engineering for the installation of a recirculation on a once-through steam generator
  • Retrofitting of separation vessel and circulation system by modifying suction and discharge of pipes, fittings, pump, expander, vents and drains, heat-up and evaporation economizer line
  • Supplement of steel structure such as platforms, stairs, brackets
  • Modification in I & C and boiler protection

Contact

Torsten Klose

Sales Director Southwest Europe & MENA
Phone +49 2261 78950 538
Cell +49 160 3696 096
Write an E-Mail

Do you have a project?

 

> contact us.

HEADOFFICE

Steinmüller Engineering GmbH
IHI Group Company
Fabrikstraße 5
51643 Gummersbach / Germany

 

T +49 (0)2261 78950-0
F +49 (0)2261 78950-199
info@steinmueller.com

Logo: IHI Corporation

 

 

 

Logo: DimBo